NEWS

Canton Fair Meeting to Machine Proposal Guide | Welldone

canton-fair-machine-proposal-cover-titled

After Booth 19.1I29: Turn a Fair Meeting into a Machine Proposal

GUANGZHOU — Buyers leaving Phase 1 of the 140th Canton Fair often return with a folder of quotations and no shared technical record. The next step is not comparing prices. It is turning one Booth 19.1I29 conversation into a comparable machine proposal.

Welldone Machine Co., Ltd. meets factory investors, procurement teams and engineers at the China Import & Export Fair Complex in Guangzhou from October 15 to 19, covering sanitary napkin, baby diaper, adult diaper and underpad machinery.

A price without a record is not a proposal

A buyer can leave the fair holding three totals and no way to tell what each one includes. The higher may carry a full reject system; the lower may omit the packing interface. Comparing totals alone selects the wrong machine.

In most cases, a conversation becomes a proposal only when the task is written down. The two sides must agree on the product, the SKU mix, the materials, the automation boundary and the acceptance conditions.

Four records to fix after the fair

  • Meeting summary. A dated note naming the product, capacity target and open questions, so the discussion does not drift from memory.
  • Sample and configuration boundary. One reference sample per SKU, the stations in and out of scope, and the materials to be trialled. This feeds the material trials and FAT protocol.
  • Factory data sheet. Column grid, clear height, door width, power and air. The supplier needs these to fit a catalogue line into the building.
  • Normalised comparison grid. The same rows for every supplier: qualified output, automation boundary, packing interface and acceptance criteria.
Welldone fluff forming drum on a baby pull-up diaper line
Fluff forming drum on a Welldone baby pull-up line — core weight and formation are fixed by the material trial, not the booth conversation.

From a follow-up email to a technical proposal

The first follow-up should confirm the product definition and ask for a station-by-station scope with a dated configuration sheet. The buyer replies with the factory data sheet and the same grid sent to every shortlisted supplier. A total price cannot be negotiated; a defined scope can.

Welldone final cutting control station on a baby pull-up diaper line
Final cutting control on the same Welldone line — the cut length and station list must belong to the confirmed scope before pricing.

The real question is whether the buyer defines the task before negotiating. Those who do spend less time re-quoting and less money on scope that never belonged to them. Start with the Booth 19.1I29 meeting checklist.

Meet Welldone at Booth 19.1I29 during Phase 1 of the 140th Canton Fair.

Website: www.cnwelldone.com  |  Email: welldone@cnwelldone.com

Request a machine proposal

Written by: Welldone Machine Engineering Team
Technical review: Mostafa Ansary, Technical Sales Manager — BSc Mechanical Design and Production Management, 15 years in production management and machinery.
Market context: Tidiane Thiero, International Sales Engineer — electrical engineer, 3 years in the hygiene industry.
Welldone Machine Co., Limited has manufactured hygiene product machinery from Jinjiang, Fujian.